Testing & Commissioning

From Reassembly to Reliable Operation.

Post-overhaul testing and commissioning services to verify mechanical condition, auxiliary systems, instrumentation, protection and turbine-generator operation before return to service.

Closing the Overhaul Loop

Reassembled Is Not the Same as Ready to Operate.

After mechanical reassembly, the turbine-generator unit must pass a structured series of checks and tests before returning to normal operation.

OVERHAUL→REASSEMBLY→TESTING→COMMISSIONING→OPERATION

Each stage verifies the work completed before moving to the next operating condition.

Pre-Commissioning Checks

Before startup, completed overhaul work and relevant turbine-generator systems are checked to confirm readiness for operation.

Mechanical

  • Final mechanical inspection
  • Rotor / shaft-line related checks
  • Bearing condition
  • Coupling / alignment confirmation
  • Relevant clearances
  • Fastener / connection checks
  • Turning gear readiness

Systems

  • Lubricating oil system
  • Jacking oil system
  • Relevant pumps
  • Oil circulation
  • Cooling systems where applicable
  • Vacuum-related systems
  • Valve readiness

Electrical & Control

  • Generator-related checks
  • Instrument verification
  • Relevant control signals
  • Protection-related checks
  • Excitation / AVR-related checks
Oil system verification before turbine rotation

Oil System Verification

Protect the Bearings Before Turning the Rotor.

Lubricating and jacking oil systems are checked before turbine-generator rotation to verify that relevant pumps, flow paths, pressures and system functions are ready for operation.

  • Oil-system circulation
  • Pump operation
  • Jacking oil operation
  • Leakage inspection
  • Relevant valve verification
  • Filter / system condition
  • Bearing oil supply checks
  • Oil flushing where required by project scope
LUBRICATIONJACKINGCIRCULATIONPROTECTION

Turning Gear & Rotor Rotation

Turning operation provides an important transition between static mechanical completion and turbine startup.

  • Turning gear operation
  • Rotor rotation condition
  • Bearing observation
  • Abnormal sound inspection
  • Relevant oil-system condition
  • Rotor / shaft-line observation
  • Instrument indications
  • Pre-start mechanical condition
STATIC→TURNING→STARTUP
Turning gear operation and rotor rotation

Instrumentation & Protection Verification

Relevant turbine-generator instruments, signals and protection functions are verified before and during return to operation according to project scope.

Temperature indication
Pressure indication
Speed signals
Vibration signals
Bearing temperature signals
Relevant LVDT / position signals
Alarm verification
Trip / protection-related checks
Relevant interlock checks

Verification scope is determined according to unit configuration and project requirements.

Valve & Governing Functional Checks

Relevant steam admission, governing and actuation components are functionally checked before turbine operation where included in the overhaul scope.

  • Main stop valve function
  • Governing / control valve function
  • Valve stroke verification
  • Actuator checks
  • Relevant LVDT / position feedback
  • Governing response checks
  • Trip-related functional verification where applicable
Valve and governing functional checks
Generator and excitation checks

Generator & Excitation Checks

Generator mechanical and electrical condition is verified together with relevant excitation functions before synchronization and load operation.

  • Final generator inspection
  • Electrical test review
  • Bearing condition checks
  • Generator instrumentation
  • Excitation circuit checks
  • AVR-related checks
  • Relevant protection verification
  • Pre-synchronization readiness
Explore Generator Overhaul

First Rotation Under Operating Conditions

Watch the Machine as It Comes Back to Life.

During startup, turbine-generator operating parameters are monitored carefully as speed increases and the unit transitions from overhaul condition to operation.

VIBRATION
BEARING TEMPERATURE
SHAFT / ROTOR CONDITION
OIL SYSTEM
VACUUM
VALVE OPERATION
SPEED
GENERATOR CONDITION
Vibration monitoring during turbine operation

Vibration Monitoring

Vibration behavior during turning, startup and operating conditions provides important information about the turbine-generator shaft train after overhaul.

ROTORBEARINGSALIGNMENTCOUPLING
↓VIBRATION BEHAVIOR
  • Startup vibration observation
  • Bearing vibration monitoring
  • Shaft vibration monitoring where applicable
  • Speed-related observation
  • Trend comparison
  • Operating-condition verification

No-Load Operation

Before taking load, the turbine-generator is observed under appropriate operating conditions to verify stability and relevant system behavior.

Turbine speed condition
Bearing condition
Vibration
Oil-system condition
Valve / governing behavior
Generator condition
Instrumentation
Relevant protection status
STARTUP→RATED / REQUIRED SPEED→STABLE NO-LOAD CONDITION→READY FOR SYNCHRONIZATION

Synchronization

From Mechanical Operation to Power Generation.

After required turbine-generator checks are completed and operating conditions are satisfactory, synchronization support can be provided according to plant procedures and project scope.

TURBINE→GENERATOR→SYNCHRONIZATION→GRID / PLANT SYSTEM

Synchronization is performed in coordination with the plant's operating team and applicable operating procedures.

Load Testing & Operating Verification

Following synchronization, turbine-generator behavior can be monitored as load is introduced and operating conditions are established.

Vibration
Bearing temperatures
Oil-system condition
Vacuum / condenser-related condition
Valve / governing behavior
Generator condition
Relevant electrical parameters
Leakage inspection
Abnormal sound / condition
Overall operating stability
NO LOAD→SYNCHRONIZE→LOAD→VERIFY

If Something Is Not Right, We Go Back to the Cause.

TEST↓ABNORMAL CONDITION?
NOCONTINUE
YES
INVESTIGATE↓CORRECT↓RETEST

Abnormal conditions identified during commissioning are reviewed before the unit progresses to the next operating stage.

Final Verification & Handover

Verify. Document. Return to Service.

Commissioning close-out includes final observations, documentation and handover to the plant operating team.

Final operating observations
Test / commissioning records
Outstanding-item review
Relevant measurement records
Final inspection
Technical recommendations
Commissioning summary
Handover documentation

Complete Commissioning Journey

01

MECHANICAL COMPLETION

02

PRE-CHECKS

03

OIL SYSTEM

04

TURNING

05

FUNCTIONAL TESTS

06

STARTUP

07

NO LOAD

08

SYNCHRONIZATION

09

LOAD

10

RETURN TO SERVICE

One Complete Overhaul Cycle

From Opening the Casing to Returning the Unit to Service.

STEAM TURBINE OVERHAULGENERATOR OVERHAULAUXILIARY SYSTEM OVERHAUL
↓
INSPECTION & DIAGNOSTICS↓
REPAIR & RESTORATION↓
TESTING & COMMISSIONING
↓RETURN TO SERVICE

Proven in the Field

From Overhaul to Startup.

Reassembly

Reassembly

Final Inspection

Final Inspection

Alignment Check

Alignment Check

Commissioning

Commissioning

Startup

Startup

Testing

Testing

Ready for Startup