
For Power Plants & Industrial Facilities in Indonesia
Steam Turbine
& Generator
Overhaul
From inspection and repair to reassembly and return to service. Focused overhaul support for your turbine-generator unit.
Brands We Service
Steam Turbine Brands
Dongfang · Shanghai Turbine · Harbin Turbine · Hangzhou Turbine · Jieneng · Siemens · GE · Mitsubishi · Toshiba · Fuji Electric
Generator Brands
Jinan Generator · Dongfang Electric · Shanghai Electric · Harbin Electric · Nanjing Electric · Siemens · GE · Mitsubishi · Toshiba
20+
Years of Industry Experience
Steam turbine industry background
300+
Turbine-Generator Service & Overhaul Engagements
Accumulated team & engineering-network experience
Engineering & Execution Resources
Professional Workforce in Indonesia
Experience figures reflect accumulated team and engineering-resource experience, not projects completed solely under the current brand.
Selected Projects
Overhaul Experience
in Indonesia

Featured Reference
60 MW Turbine-Generator Major Overhaul
Jambi, Indonesia

N15-3.53 Turbine-Generator Maintenance
Jambi, Indonesia

Waste Heat Power Generation Unit Major Overhaul
Dexin Steel, Indonesia
Core Capabilities
Steam Turbines. Generators.
One Overhaul Focus.

Steam Turbine Overhaul
Casing, rotor, blades, bearings, steam seals, valves and governing components. Complete turbine overhaul from dismantling to return to service.
Learn More
Generator Overhaul
Mechanical and electrical inspection, testing and repair. Rotor, stator, bearings, insulation, excitation and commissioning support.
Learn MoreSupporting Services
Spare Parts Support
Identification · Sourcing · Technical matching — integrated with overhaul work
Our Process
A Clear Process.
From Shutdown to Return to Service.
Planning & Preparation
Documentation, scope, resources and safety requirements
Shutdown & Dismantling
Equipment isolation, condition recording, systematic disassembly
Inspection & Measurement
Comprehensive inspection and precision measurement of components
Technical Assessment
Engineering evaluation against OEM and technical standards
Repair & Restoration
Corrective work based on inspection findings and customer confirmation
Reassembly & Alignment
Precision reassembly with verified clearances and alignment
Testing & Return to Service
Structured testing and commissioning before return to operation
Planning & Preparation
Documentation, scope, resources and safety requirements
Shutdown & Dismantling
Equipment isolation, condition recording, systematic disassembly
Inspection & Measurement
Comprehensive inspection and precision measurement of components
Technical Assessment
Engineering evaluation against OEM and technical standards
Repair & Restoration
Corrective work based on inspection findings and customer confirmation
Reassembly & Alignment
Precision reassembly with verified clearances and alignment
Testing & Return to Service
Structured testing and commissioning before return to operation
Inspection Records
Documented findings before decisions
Agreed Corrective Scope
Customer confirmation before repair
Verification & Handover
Testing before return to service

Our Approach
Engineering Resources.
Local Execution.
We combine deep Chinese turbine engineering experience with local Indonesian project execution. Project teams are organized according to turbine type, generator configuration, overhaul scope and technical requirements.
When specialized expertise is required, we mobilize experienced engineers from China and combine them with professional Indonesian technicians and skilled workers for local execution.
Spare Parts Support
Integrated with Your Overhaul
Spare parts support is part of our overhaul work — not a separate business. We assist with identifying the correct components, sourcing suitable replacements, and ensuring technical matching so that parts availability aligns with your overhaul schedule.
Identification
Matching parts to equipment specifications and overhaul requirements
Sourcing
Accessing quality components through established supply channels
Technical Matching
Verifying compatibility before installation
Start a Conversation
Tell Us About Your
Next Outage
Equipment & Model
Turbine/generator manufacturer and model
Unit Capacity
MW rating or unit size
Planned Outage
Target dates and duration
Required Scope
Preliminary overhaul requirements